Agilent Technologies Switch/Measure Uživatelský manuál Strana 6

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 36
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 5
6
Choosing measurements
As mentioned, ETSI and ANSI specifications are devised for type approval
purposes. It is not practical to perform the complete set in every environment;
GSM equipment manufacturers and network operators must balance test
coverage with other factors such as cost and time. Nobody prescribes the
specific measurement set to be used at any one point in the GSM lifecycle
1
measurements must be chosen for each requirement. At each stage in the
development, manufacturing and maintenance cycles, measurements and
measuring equipment must be chosen according to need.
Test phases
At a high level the GSM lifecycle for base transceiver stations (BTS) is
summarized in the following diagrams:
Lifecycle Phase Purpose of Test
R&D Create and optimize design
Stress-test design/find corner cases
Verification Prove compliance before submitting to type approval
Find faults
Type approval Prove absolute compliance
Module test Calibration (manual and electronic)
Prove correct assembly and performance
Final test Prove correct assembly and performance
Configure and prove configuration
Confidence
QA test Quality control
Prove compliance/confidence
End-customer demonstration
Installation Prove correct field operation
Configure and prove configuration
Maintenance Monitor performance degradation and repair/swap out as required
Depot repair Repair/recalibrate modules for field
Trade-offs and compromises
It is not necessary or practical to make the whole suite of measurements, with
the same integrity (accuracy, dynamic range and number of averages) at each
point in the lifecycle. Generally the following factors are subject to trade-offs:
Test cost
Test coverage
Test throughput
Test system flexibility
The test cost of each unit can be reduced by performing measurements only
on the devices that have a real possibility of failing or performing only the
measurements required for device characterization.
Base Transceiver Station Test Lifecycle
R&D
Verification
Type
approval
Module
test
Final test QA test Installation
Lab Factory
Maintenance
Depot
repair
Field
Figure 2. BTS lifecycle
1. Exceptions: first, the ETSI and ANSI specifications do define the test suite for type approval. Also, in certain countries regulatory bodies do recommend
a test list for unit manufacturing final test and also for installation and maintenance test.
Zobrazit stránku 5
1 2 3 4 5 6 7 8 9 10 11 ... 35 36

Komentáře k této Příručce

Žádné komentáře