Agilent Technologies Weather Radio 1680 Uživatelský manuál Strana 29

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 174
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 28
29
Chapter 3: Testing Performance
To test the threshold accuracy
Connect and configure the logic analyzer
1 Using the 17-by-2 test connector, BNC cable, and probe tip assembly,
connect the data and clock channels of Pod 1 to the free side of the BNC
Tee.
2 Configure the logic analyzer:
a Click the Bus/Signal Setup icon. The Analyzer Setup dialog opens.
b In the Buses/Signals tab, click Delete All at the bottom of the dialog.
c Using the mouse, activate all Pod 1 channels. Assign channels to bus/
signal name My Bus 1.
d Scroll the channel assignments to the left. Assign the clock/data
channel for the Pod 1 (that is, C1) to My Bus 1.
3 Activate the DC source output.
Zobrazit stránku 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 173 174

Komentáře k této Příručce

Žádné komentáře