
1100 Series Capillary LC System Manual 9
Installing your Capillary LC System 1
Install the Thermostatted Column Compartment (TCC) (G1316A)
1 Ensure the line power switch at the front of the Thermostatted Column
Compartment (TCC) is off
2 Place the TCC on top of the DAD. Make sure that the two modules are
interlocked correctly.
3 Connect the Can-bus cable (5181-1516) to one of the CAN connectors at the
rear of the TCC.
4 Connect the power cable to the power socket at the rear of the TCC. Do not
connect the power cable to power until you have finished the hardware
installation of all modules in the stack.
5 Connect the free end of the Can-bus cable from the DAD to the unused
Can-bus connector at the rear of the TCC.
6 Place the analytical column into the TCC. Observe the flow direction
indicated on the column. The column can later be secured using column
clamp (5001-3702).
7 Connect the DAD flow cell inlet capillary (G1315-68703) to the outlet of the
analytical column.
Connect the power cable to power only after you have finished the hardware
installation of all modules in the stack.
Carefully route all capillaries so that they are not crushed or broken by module front covers.
Avoid excessive bending. Chapter 2 for advice on handling capillaries.
If your TCC has a Micro Column Switching Valve, refer to the Micro Column Switching Valve
information in Chapter 6 of this manual.
Komentáře k této Příručce