2-94 Fully Coded 3GPP W-CDMA Personality User’s and Programming Guide
Using Functions ESG Family Signal Generators
3GPP W-CDMA Base Station Performance Testing Option 200
Example Test Procedure
Follow this example procedure to perform a 3GPP W-CDMA adjacent channel selectivity
test on your BS. Perform the procedures in the subsections sequentially, in the order in
which they appear in this document.
Subsection 1. Equipment Setup and Preliminary BER Verification
Complete the following steps to connect the equipment and perform a BER verification test
on your BS.
Figure 2-18 Adjacent Channel Selectivity Equipment Setup
1. Connect the BS to the test system as shown in Figure 2-18.
a. Using the appropriate cables, adapters, and antennae, connect the output of the two
ESGs to the RF input ports of the signal combiner.
b. Connect the RF output port of the signal combiner to the RF input of the BS.
c. Connect the system controller and the BER test platform to the BS.
2. Measure the Bit Error Ratio (BER) of the BS.
The controller or BER test platform is measuring the bit error ratio of the BS exposed to
the RF output of ESG 1 only. This process verifies that the BER of the BS is within
specification without the adjacent channel interferer.
3. Record the first BER measurement result in the column titled, “Verification BER Value”
in Table 2-50.