
Fully Coded 3GPP W-CDMA Personality User’s and Programming Guide 2-61
ESG Family Signal Generators Using Functions
Option 200 3GPP W-CDMA User Equipment Performance Tests
Example Test Procedure
Follow this example procedure to perform a 3GPP W-CDMA spurious response test on
your UE. Complete the subsections of this procedure sequentially, in the order in which
they appear in this document.
Subsection 1. Equipment Setup and Preliminary BER Verification
Complete the following steps to connect the equipment and perform a BER verification test
on your UE.
Figure 2-10 BER Verification Equipment Setup
1. Connect the UE to the test system as shown in Figure 2-10.
a. Using the appropriate cables, adapters, and antennae, connect the output of ESG 1
to the RF input of the UE.
b. Connect the system controller (and the BER test platform) to the UE.
2. Perform call acquisition functions for the UE.
From the system controller, perform all of the call acquisition functions required to
enable the UE to demodulate transmitted data, in order to perform bit error ratio
measurements.
These call acquisition functions include:
a. acquiring the primary synchronization channel (P-SCH),
b. acquiring the secondary synchronization channel (S-SCH) and determining the
secondary scramble code group,
c. acquiring and synchronizing to the common pilot channel (CPICH),
d. acquiring the primary common control physical channel (PCCPCH) and determining
system frame number.
Komentáře k této Příručce