Agilent Technologies ESG Specifikace Strana 64

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 302
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 63
2-48 Fully Coded 3GPP W-CDMA Personality User’s and Programming Guide
Using Functions ESG Family Signal Generators
3GPP W-CDMA User Equipment Performance Tests Option 200
Example Test Procedure
Follow this example procedure to perform a 3GPP W-CDMA blocking characteristics test
on your UE. Complete the subsections of this procedure sequentially, in the order in which
they appear in this document.
Subsection 1. Equipment Setup and Preliminary BER Verification
Complete the following steps to connect the equipment and perform a BER verification test
on your UE.
Figure 2-7 BER Verification Equipment Setup
1. Connect the UE to the test system as shown in Figure 2-7.
a. Using the appropriate cables, adapters, and antennae, connect the output of ESG 1
to the RF input of the UE.
b. Connect the system controller (and the BER test platform) to the UE.
2. Perform call acquisition functions for the UE.
From the system controller, perform all of the call acquisition functions required to
enable the UE to demodulate transmitted data, in order to perform bit error ratio
measurements.
These call acquisition functions include:
a. acquiring the primary synchronization channel (P-SCH),
b. acquiring the secondary synchronization channel (S-SCH) and determining the
secondary scramble code group,
c. acquiring and synchronizing to the common pilot channel (CPICH),
d. acquiring the primary common control physical channel (PCCPCH) and determining
system frame number.
Zobrazit stránku 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 301 302

Komentáře k této Příručce

Žádné komentáře